Preparation of detailed project report of Multi Purpose Office Building, Chitwan
Engineering survey, design and drawing of proposed building.
Preparation of design, drawings and report.
Preparation of 3 dimensional drawing of the building.
Make an economic analysis and test its sensibility.
Prepared implementation plan based upon the available resources for phase wise construction.
Produced detailed cost estimate of the project based on approved municipal rates.
Consulted with the local stakeholders during the design and finalization of the design.
Produced any other data report, drawing etc. as demanded by Rapti municipality during the course of project implementation.
Prepared final detail project report including all above mentioned points.
Other Projects
White House at Sitapaila, Kathmandu
Traditional House
DPR Preparation of East Rapti River Training Works
DETAILED FEASIBILITY STUDY AND DESIGN OF BUKALA IRRIGATION SYSTEM, MYAGDI
Detailed Feasibility Study of Khalte Phant Ryale Birtakhet Solar Lift Irrigation Sub-Project, Tanahu and Tllo Churunga Dharapani Solar Lift Irrigation Sub Project, Kaski